Week 5

Assignment Content

  1. In Week 1, you discussed GIG, Inc.’s benefits and concerns with moving to the cloud. In Week 2, you created a high-level diagram of a system using built-in AWS that provided reliability, availability, and continuity across the migrated environment. In Week 3, you chose a database and created a diagram that visualized the chosen system and implementation steps. Last week, you created a spreadsheet that covered each level and provided a summary of the structures that explained the security benefits.
    This week, compile all your work from previous weeks and integrate it into your migration plan in a cohesive manner. Additional material about the transition may be required. The plan will be presented to the CEO, CFO, and CTO and should have a professional construction.
    You will then create a 10- to 12-slide multimedia-rich Microsoft® PowerPoint® presentation that explains the proposed migration plan and includes the following items:

    • Benefits of moving to the cloud
    • One-for-one transition plan for the given requirement (e.g., the webserver will be moved to an EC2 instance that is placed behind an ELB)
    • Proposed architecture diagram (how systems are set up)
    • Proposed network flow diagram (how data flows through the system)
    • IAM security policy plan
    • Database plan
    • Submit your plan and presentation.

Needs help with similar assignment?

We are available 24x7 to deliver the best services and assignment ready within 3-4 hours? Order a custom-written, plagiarism-free paper

Get Answer Over WhatsApp Order Paper Now