Week 5
Assignment Content
- In Week 1, you discussed GIG, Inc.’s benefits and concerns with moving to the cloud. In Week 2, you created a high-level diagram of a system using built-in AWS that provided reliability, availability, and continuity across the migrated environment. In Week 3, you chose a database and created a diagram that visualized the chosen system and implementation steps. Last week, you created a spreadsheet that covered each level and provided a summary of the structures that explained the security benefits.
This week, compile all your work from previous weeks and integrate it into your migration plan in a cohesive manner. Additional material about the transition may be required. The plan will be presented to the CEO, CFO, and CTO and should have a professional construction.
You will then create a 10- to 12-slide multimedia-rich Microsoft® PowerPoint® presentation that explains the proposed migration plan and includes the following items:- Benefits of moving to the cloud
- One-for-one transition plan for the given requirement (e.g., the webserver will be moved to an EC2 instance that is placed behind an ELB)
- Proposed architecture diagram (how systems are set up)
- Proposed network flow diagram (how data flows through the system)
- IAM security policy plan
- Database plan
- Submit your plan and presentation.
Needs help with similar assignment?
We are available 24x7 to deliver the best services and assignment ready within 3-4 hours? Order a custom-written, plagiarism-free paper
Get Answer Over WhatsApp Order Paper Now